KirklandGold.com – The 2nd Mile Property Viewer

1-89 is a diamond drill hole drilled by Fernand Rivard in 1989, in Otto township near Kirkland Lake, Ontario. It was drilled to 130 m towards 120° at -50°. Its collar is about 4.5 km east of the Reed showing on the Eby–Otto property.

Hole details

Hole
1-89
Drilled by
Fernand Rivard
Year
1989
Township
Otto
Collar (UTM 17, NAD83)
568372 E, 5326882 N
Latitude, longitude
48.09154, -80.08180
Azimuth
120°
Dip
-50°
Length
129.6 m

The filed report

Assessment file 42A01SE0116: Diamond Drilling Report No 27 Otto Township (1989). Read the report

Ontario drill hole database record ↗

Nearby holes

  • OT4-92 – 113 m north, 1992, F Rivard
  • OT3-92 – 781 m west, 1992, P Rivard
  • OT1-92 – 852 m south-west, 1992, P Rivard
  • OT2-92 – 852 m south-west, 1992, P Rivard
  • JA 89-1 – 856 m north-east, 1989, Jocelyne A Kidston
  • OT-90-1 – 878 m south-west, 1990, Fernand Rivard
  • 32936 – 1.2 km north-east, 1968, Canadian Nickel Company Ltd
  • BR-80-1 – 1.4 km south, 1980, Minorex Ltd
  • BR-80-2 – 1.5 km south, 1980, Minorex Ltd
  • BR-80-4 – 1.5 km south, 1980, Minorex Ltd

Invest with us

Kirkland Gold is an independent prospector partnership. The Eby–Otto property is open to an investor.

Apply to be an investor Talk to us Request a site visit
Open the Property Viewer