KirklandGold.com – The 2nd Mile Property Viewer

Home › Gold mines near Kirkland Lake › Chesterville mine

The Chesterville mine, at Kearns in McGarry township, worked the same ground as its big neighbour Kerr-Addison, whose shaft stood only about 500 m away.

History

Four men from Chesterville, Ontario, staked the claims in 1906, which gave the mine its name, and the company was formed in 1907. Early work was a short adit and shafts. Drilling in 1937 found more ore, and a 500-ton mill was built in 1938. The mine opened in June 1939 and poured its first gold bar on 29 July 1939. It had 166 men on the payroll in 1944.

Chesterville produced 358,880 ounces of gold from about 2.96 million tonnes, at about 3.8 grams a tonne, most of it from the top 400 m of a shaft about 850 m deep. It closed in 1952, and Kerr Addison Mines took over the property in 1957.

The site

The provincial inspection of 2012 found the mill, crusher and office foundations, an area of subsided openings with cracked, unstable ground, and raises. The old tailings form a beach at the far end of Larder Lake's north-east arm.

Old mine sites have open raises, shafts and unstable ground. They are private or closed: please don't visit them.

At a glance

  • McGarry township, Kearns
  • About 34 km east of Kirkland Lake
  • Producing 1939–1952
  • About 359,000 oz

Sources

Where sources give different dates or totals, this page says so or uses the provincial record. Spotted a mistake or have a photo or story to add? Tell us.

Invest with us

Kirkland Gold is an independent prospector partnership. The Eby–Otto property is open to an investor.

Apply to be an investor Talk to us Request a site visit
Open the Property Viewer