The Chesterville mine, at Kearns in McGarry township, worked the same ground as its big neighbour Kerr-Addison, whose shaft stood only about 500 m away.
History
Four men from Chesterville, Ontario, staked the claims in 1906, which gave the mine its name, and the company was formed in 1907. Early work was a short adit and shafts. Drilling in 1937 found more ore, and a 500-ton mill was built in 1938. The mine opened in June 1939 and poured its first gold bar on 29 July 1939. It had 166 men on the payroll in 1944.
Chesterville produced 358,880 ounces of gold from about 2.96 million tonnes, at about 3.8 grams a tonne, most of it from the top 400 m of a shaft about 850 m deep. It closed in 1952, and Kerr Addison Mines took over the property in 1957.
The site
The provincial inspection of 2012 found the mill, crusher and office foundations, an area of subsided openings with cracked, unstable ground, and raises. The old tailings form a beach at the far end of Larder Lake's north-east arm.
Old mine sites have open raises, shafts and unstable ground. They are private or closed: please don't visit them.
At a glance
- McGarry township, Kearns
- About 34 km east of Kirkland Lake
- Producing 1939–1952
- About 359,000 oz
Sources
- Ontario Geological Survey, Mineral Deposit Inventory: Chesterville (MDI32D04SE00012)
- Ontario Geological Survey, Abandoned Mines Information System: Chesterville (08323)
- Wikipedia: Chesterville gold mine (citing OGS Open File Report 5831)
Where sources give different dates or totals, this page says so or uses the provincial record. Spotted a mistake or have a photo or story to add? Tell us.