EO-22-002 is a diamond drill hole drilled by Canada Silver Cobalt Works Inc in 2022, in Eby township near Kirkland Lake, Ontario. It was drilled to 450 m towards 345° at -46°. Its collar is about 3.8 km south-west of the Reed showing on the Eby–Otto property.
Hole details
- Hole
- EO-22-002
- Drilled by
- Canada Silver Cobalt Works Inc
- Year
- 2022
- Township
- Eby
- Collar (UTM 17, NAD83)
- 560950 E, 5324715 N, 326 m elevation
- Latitude, longitude
- 48.07280, -80.18178
- Azimuth
- 345°
- Dip
- -46°
- Length
- 450 m
The filed report
Assessment file 20000020820: Report on a Diamond Drilling Program at the Highway 66 Claims (Tinney Option Agreement), Eby Township, Larder Lake Mining Division (2022). Read the report
Ontario drill hole database record ↗
Nearby holes
- EO-22-001B – 11 m south-east, 2022, Canada Silver Cobalt Works Inc
- EO-22-001 – 13 m south-east, 2022, Canada Silver Cobalt Works Inc
- EO-22-003 – 322 m north-west, 2022, Canada Silver Cobalt Works Inc
- 1 – 1.2 km east, 1965, Unknown
- Fishkin 3 – 1.2 km east, 1969, M Fishkin
- ME-87-51 – 1.3 km north-west, 1987, Mary Ellen Resources Ltd
- ME-87-59 – 1.5 km north, 1987, Mary Ellen Resources Ltd
- ME-87-61 – 1.5 km north, 1987, Mary Ellen Resources Ltd
- ME-87-60 – 1.5 km north, 1987, Mary Ellen Resources Ltd
- ME-87-58 – 1.5 km north-west, 1987, Mary Ellen Resources Ltd
