Eby township is in the Kirkland Lake area of northern Ontario. Part of the Eby–Otto gold property lies in Eby township, the rest in neighbouring Otto township. Ontario's public assessment files hold 203 reports on Eby township, covering 1939 to 2024, and 136 drill holes are on file there. The work is centred about 4.9 km west of the Reed showing on the Eby–Otto property.
What was done
- Diamond Drilling – 48 reports
- Magnetic / Magnetometer Survey – 46 reports
- Assaying and Analyses – 43 reports
- Geological Survey / Mapping – 39 reports
- Overburden Stripping – 32 reports
- Electromagnetic – 24 reports
- Geochemical – 21 reports
- Electromagnetic Very Low Frequency – 15 reports
- Open Cutting – 15 reports
- Prospecting By Licence Holder – 15 reports
Best gold in drill core
The highest single gold assays filed for holes in Eby township (as filed, converted to grams per tonne):
- ME-87-04 (Mary Ellen Resources Ltd, 1987): 25 g/t Au
- ME-87-11 (Mary Ellen Resources Ltd, 1987): 9.096 g/t Au
- ME-87-48 (Mary Ellen Resources Ltd, 1987): 7.75 g/t Au
- ME-87-30 (Mary Ellen Resources Ltd, 1987): 6.507 g/t Au
- ME-87-25 (Mary Ellen Resources Ltd, 1987): 6.491 g/t Au
Filed reports
2020s
- Report on the 2024 Field Program on Project Norris, Barrick Gold Timiskaming District – 2024, Barrick Gold Inc
- Report of Assessment Work 2023 - Lost Hope Mine Burt Project – 2023, Lost Hope Mine Ltd
- Assessment Report; Grassroots exploration, Geochemical sampling of the EBY Project – 2023, Mistango River Resources Inc
- Claim No 745860; Report of Assessment Work 2023 Lost Hope Mine Kirkland West Gold Project – 2023, Lost Hope Mine Ltd
- Report on 2023 Rock sampling on the Norris Project Timiskaming District – 2023, Barrick Gold Inc
- Report on Data Acquisition - UAV-Borne Magnetic Survey, Eby Otto Project; and Advanced Processing and 3D Inversion of UAV-Borne Magnetic Survey Data (plus CCW property/option compilation maps) – 2022, Canada Silver Cobalt Works Inc
- Ground Geophysical Survey Work Report on a 3D DCIP Survey at the Reed-Robinson Claims (Eby-Otto Property), Eby & Otto Townships, Larder Lake Mining Division – 2022, Canada Silver Cobalt Works Inc; Doug Robinson
- Report on a Diamond Drilling Program / Report on Drill Core Assay and Geochemical Results at the Reed-Robinson Claim Group – 2022, Canada Silver Cobalt Works Inc; Doug Robinson
- Report on a Diamond Drilling Program at the Highway 66 Claims (Tinney Option Agreement), Eby Township, Larder Lake Mining Division – 2022, Canada Silver Cobalt Works Inc
- Prospecting Report on the Eby West Claim Group – 2022
- Winter Prospecting Report on the Eby West Claim Group – 2022
- Report of Assessment Work 2022 Lost Hope Mine Kirkland West Gold Project – 2022, Lost Hope Mine Ltd
- Assessment Report for Diamond Drilling on the Kenogami Lake Property – 2021, North Peak Resources
- Assessment Report for Diamond Drilling on the Kenogami Lake Property, June 2021 – 2021, North Peak Resources
- Prospecting Report on The "1" and John Doh Properties – 2021, Canada Silver Cobalt Works Inc
- Report of Assessment Work 2021, Kirkland West Gold Project – 2021
- 2021 - 2022 Drill Program on the Kirkland West Property Grenfell and Teck Townships, Ontario – 2021-2023, Mistango River Resources Inc
- Report On Deposit-Alteration Modeling 2021 Fieldwork Reed Robinson Property – 2021–2023
- Technical Report of Grassroots Prospecting, Lost Hope Mine Project – 2020
- Assessment Report: Geochemical and Structural Sampling of the EBY Project – 2020-2021, Mistango River Resources Inc
2010s
- 2019 Prospecting and Mapping Report, Burt-Eby Project – 2019
- Claim L1239350, Eby Township [Prospecting Report] – 2016
- Preliminary Report on MMI Soil Survey and First Nations Consultation (January 2018), Reed Robinson Property, Eby-Otto Townships, Larder Lake Mining Division – 2016 to 2018
- L4245813 Eby & Otto Township – 2015-2016
- Induced Polarization and Magnetometer Surveys over the Allsopp-Huston Property – 2015, Atacama Resources International Inc
- Q2359 – Atacama 1 and 2 Properties Magnetometer Survey – 2015-2017, Atacama Resources International Inc
- Preliminary Report on MMI Soil Survey and First Nations Consultation (January 2013), Reed Robinson Property, Eby-Otto Townships, Larder Lake Mining Division – 2012 to 2013
- Assessment Report on Diamond Drilling on the Kenogami Lake Property Eby Twp – 2011
- Assay certificates for Report on Diamond Drilling | Report on Diamond Drilling – 2011-2012
- Induced Polarization Line Cutting Report Eby Township – 2010, West Kirkland Mining Inc
- Interim Report on Line-cutting and Magnetic Profiles of Selected Drill Targets, Eby-Kirkland Property, Eby and Otto Townships – 2010-2011
- Assessment Report on Diamond Drilling Eby Township – 2010-2011
- Report on Soil Study - MMI Sampling (December 2010), Eby West Property, Eby Township – 2010-2011
- South Break Group Eby Otto Twps | Report on Total Magnetic Field Strength Eby Otto Twp – 2010-2011
2000s
- Diamond Drill Assay Report Eby Township – 2007, TLC Resources Inc
- Magnetic Survey Overburden Drilling Report Eby Township – 2006, TLC Resources Inc
- Geophysical IP Report | Geological Report Grenfell Township – 2006-2007, Richview Resources Inc; Ysv Ventures Inc
- Stripping Sampling Report Eby Township – 2005
- Prospecting Magnetic Geochemical Testing Report – 2005-2007, Southernera Diamonds Inc
- Diamond Drilling Report Eby Township – 2004-2005, GLR Resources Inc
- Diamond Drilling Report Eby Township – 2004, GLR Resources Inc
- RPT ON MECHANICAL STRIPPING & TRENCHING EBY TP – 2003
- Report on Exploration Activities Claim 1167172 Eby Township – 2003-2004, GLR Resources Inc
- RPT ON SOIL GCHEM SURV EBY PROP; UPDATED RPT ON SOIL GCHEM SURV EBY PROP – 2003-2004, GLR Resources Inc
1990s
- Report on IP Survey Eby Township Property – 1998, Greater Lenora Resources Corp
- DRILL HOLE RECORD HOLE M98-1; DRILL HOLE RECORD HOLE M98-2 – 1998, Greater Lenora Resources Corp
- WORK RPT REED-ROBINSON PROP EBY & OTTO TPS; ASSESSMENT RPT EBY N GROUP EBY & OTTO TPS – 1998, Nastek Expl Ltd
- OPAP FINAL SUBMISSION 1998 EBY TP PART I; OPAP FINAL SUBMISSION 1998 EBY TP PART II – 1998-1999
- Assessment Report Eby West Property – 1997-1999
- EVALUATION OF THE NASTEK EXPL LTD REED-ROBINSON PROP; NASTEK EXPL LTD REED-ROBINSON PROP EBY & OTTO TPS; NASTEK EXPL LTD EBY N GRID – 1997, J E Tilsley & Assoc Ltd; Nastek Expl Ltd
- ASSESSMENT RPT EBY W & OTTO TP PROP – 1996 to 1997
- WORK RPT EBY & OTTO TPS; ASSESSMENT RPT EBY N GROUP – 1996-1998, Nastek Expl Ltd
- RPT ON THE PROS ON THE BARRY MCCOMBE GRENFELL W GROUP GRENFELL TP 1995 & 1996 – 1995-1996
- ASSESSMENT RPT GEOPHYS OF THE J. REED GROUP – 1995
- REPORT ON THE ROGICK-ELLIOTT-CLARK/WALTERS PATENTS – 1995, Greater Lenora Resources Corp
- Geophysical Report on IP Survey for Greater Lenora Resources on Eby Township Properties – 1995, Greater Lenora Resources Corp; RJK Explorations Ltd
- RPT ON RC DRILLING PRG EBY TP PROPERTY EBY & GRENFELL TP – 1995, Greater Lenora Resources Corp
- ASSESSMENT RPT EBY W & OTTO TP PROP – 1995 to 1997
- ASSESSMENT RPT EBY W & OTTO TP PROP – 1995-1997
- RPT ON 1994 DRILLING PROGRAM ON KENOGAMI LAKE E PROJ; GEOCHEM ANALYSIS CERTIFICATE – 1994, Westminer Canada Ltd
- Report on Grd Magnetic Geophysical Survey for Lenora Resources Corp Kenogami Lake Grid – 1994, Greater Lenora Resources Corp
- Report on Reverse Circulation Overburden Drilling Program – 1994, Greater Lenora Resources Corp
- Assessment Report, Eby NW & SE Groups (Doug Robinson) - 1994 work, dated January 2, 1996 (file 2.16369) – 1994
- ASSESSMENT RPT EBY NW & SE GROUPS – 1994 to 1995
- ASSESSMENT RPT EBY-OTTO NE GROUP – 1994 to 1995
- RPT ON DD PROG EBY TP; RPT ON GEOPHYS EBY & GRENFELL TPS – 1994, Westminer Canada Ltd
- KIRKLAND LAKE W PROJ RPT ON GEOPHYS EXPL 1993-1994 – 1994, WMC International Ltd
- RPT ON GEOPHYS BURT & EBY TPS; RPT ON DD PROG BURT TP – 1994, WMC International Ltd
- ROW GEOL MAPPING EBY – 1993
- Report on the Eby Township Diamond Property – 1993, Greater Lenora Resources Corp
- OPAP FINAL RPT EBY W & EBY E PROP; OPAP PROSPECTING PROG EBY TP AREA – 1992
- RPT ON STRIPPING & DRILLING PROG – 1992
- RPT ON STRIPPING & DD PROGS DIABASE DIKE PROP – 1992
- RPT ON HOTCHKIN LAKE DIAMOND PROP GRENFELL TP; RPT ON WESLEY TP PROP LARDER LAKE MIN DIV FOR GREATER LENORA RESC GROUP; RPT ON EBY TP DIAMOND PROP FOR GREATER LENORA RESC CORP; RPT ON RICKARD TP PROP – 1992-1993, Greater Lenora Resources Corp
- RPT ON STRIPPING PROG; RPT ON MAG & VLF-EM SURVEY & GEOL MAPPING & SAMPLING; RPT ON HLEM (MAX-MIN) SURVEY GEOL SURVEY DD; RPT ON VLF-EM 16 SURVEY & SAMPLING – 1991
- FINAL SUBMISSION ( WORK RPT) – 1991
- Report Stripping Program – 1991
- KIRKLAND L PROJ RPT ON GEOL MAPPING AMALGAMATED KIRKLAND PROP TECK TWP OM90-122; RPT ON A MAG SUR AMALGAMATED KIRKLAND PROP; RPT ON AN IP/RES SUR AMALGAMATED KIRKLAND PROP; RPT ON GEOL MAPPING/OB STRI – 1990, Battle Mountain Canada Ltd
- Analyses of Diamond Drilling Sludge – 1990
- Diamond Drilling Report 25 Eby – 1990
- ROW ASSAYING EBY – 1990
- ROW DIAMOND DRILLING EBY – 1990
- RPT OF DD OTTO TWP OP-90-121 – 1990
- ASSAY CERTIFICATES RECEIPTS & DD LOGS – 1990
1980s
- Exploration Report East Eby Property – 1988, Butte Canyon Resources Inc
- VLF & HLEM SUR RPT - E EBY PROP – 1988, Butte Canyon Resources Inc
- Diamond Drilling Report 24 Eby – 1988, Mary Ellen Resources Ltd
- ROW VLF EBY – 1988, Mary Ellen Resources Ltd
- ROW POWER STRIPPING EBY – 1988, Mary Ellen Resources Ltd
- ROW GEOL EBY – 1988, Butte Canyon Resources Inc
- ROW GEOCH EBY – 1988, Butte Canyon Resources Inc
- ROW POWER STRIPPING EBY – 1988
- ASST RPT ON CL L980369 & L980368 – 1988, Mary Ellen Resources Ltd
- RPT ON COMBINED HELICOPTER BORNE MAG EM & VLF SUR BEG PROP – 1988, Ressources Halex Inc
- AMAG AEM & AVLF SUR BEG PROP – 1988, Ressources Halex Inc
- Report on a Geophysical Survey – 1987, Premier Explorations Inc
- Report on Magnetic Survey East Eby Property – 1987, Butte Canyon Resources Inc
- Reverse Circulation Overburden Drilling and Heavy Mineral Geochemical Sampling – 1987, Mary Ellen Resources Ltd
- ASST RPT ON CL L-842563 EBY TWP – 1987, Mary Ellen Resources Ltd
- Geophysical Survey Report Perron Property Eby 66 Group Eby Township – 1987
- ROW GEOL EBY – 1987
- ROW GEOL EBY – 1987
- ROW EM & MAG EBY – 1987
- GEOL & GEOPH SUR RPT ON THE PERRON PROP EBY EIGHT GRP EBY TWP – 1987
- Geophysical Survey Report Perron Property Deadman Mine Group Eby Township – 1987
- Geophysical Survey Report on the Eby 66 Group – 1986
- Diamond Drilling Report 23 Eby Township – 1986
- GEOPH AND GEOL SUR RPT ON ANDY'S CL EBY TWP – 1986
- ROW POWER STRIPPING EBY – 1986
- ROW POWER STRIPPING EBY – 1986
- ROW MANUAL WORK EBY – 1986
- ROW POWER STRIPPING EBY – 1986
- ROW POWER STRIPPING EBY – 1986, Mary Ellen Resources Ltd
- ROW PLUGGER & PUMP EBY – 1986, Mary Ellen Resources Ltd
- ROW MANUAL WORK EBY – 1986, Mary Ellen Resources Ltd
- PROGRESS RPT ON THE EBY TWP GOLD PROP MAY 1985 - JAN 25 1986 – 1985, Mary Ellen Resources Ltd
- Diamond Drilling Report 22 Eby – 1985
- A Report on the Eby Township Gold Property of Mary Ellen Resources – 1985, Mary Ellen Resources Ltd
- Geological Survey Report on the Eby 66 Group – 1985
- Report on Geological Survey Eby Four Group – 1985
- ROW POWER STRIPPING EBY – 1985
- ROW PLUGGER WORK EBY – 1985
- ROW GAS PLUGGER EBY – 1985
- ROW POWER STRIPPING EBY – 1985
- Geological Survey Report on the Deadman Mine Group – 1985
- Report on Vertical Gradient Aeromagnetic Survey Burt Holmes and Eby Township – 1985, Billiton Canada Ltd
- Assessment Report Geological Survey Group B Reed Claim – 1984
- Expenditures Report Assay Otto Township – 1984
- Assessment Report Geological Survey Group a – 1984
- Geophysical Report on the Eby Township Property of Hemlo Reef Resources Ltd – 1984, Hemlo Reef Resources Ltd
- Diamond Drilling Report 20 Eby – 1984
- Diamond Drilling Report 21 Eby – 1984
- ROW POWER STRIPPING EBY – 1984
- ROW POWER STRIPPING EBY – 1984
- ROW POWER STRIPPING EBY – 1984
- ROW MANUAL WORK EBY – 1984
- ROW POWER STRIPPING EBY – 1984
- ROW POWER STRIPPING EBY – 1984
- ROW MANUAL WORK EBY – 1984
- Report on Airborne Geophysics Surveys – 1984, Billiton Canada Ltd
- OM83-6-P-207 RPT MECHANICAL STRIPPING OTTO AND EBY TWP – 1983
- Report Kenogami Lake Gold Property – 1983, Hemlo Reef Resources Ltd
- Report Geophysical Survey Kenogami Lake Property – 1983, Gren-Teck Kirkland Resources Ltd
- Kenogami Lake Gold Property Report Eby Township – 1983
- ROW AIRBORNE EM & MAG EBY – 1983
- ROW AIRBORNE EM & MAG EBY – 1983
- ROW AIRBORNE EM & MAG EBY – 1983, Argentex Resource Exploration Corp
- REPORT ON COMBINED HELI-BORNE SURVEYS – 1983, Lenora Exploration Ltd
- Assessment Report RAD Survey Claim Group B – 1982
- Report on Geophysical Survey – 1982
- Assessment Report Spectrometer Radiometric Survey Reed Claims Group a – 1982
- ROW MANUAL LABOUR EBY – 1982
- ROW SPECTROMETER EBY – 1982
- Report on Geophysical Survey Group a – 1981, Jomi Minerals & Expediting Ltd
- ROW EM & RADIOMETRIC EBY – 1981
- ROW ROCK TRENCHING EBY – 1981
- GEOPH SUR ON ELY 1-79 GRP; GEOPH SUR ON MAISONVILLE 1-79 GRP; GEOPH SUR ON MCVITTIE 1-79 GRP – 1980, Noranda Exploration Co Ltd
- Diamond Drilling Report Eby Township – 1980
- Diamond Drilling Report 18 Eby Township – 1980
- GEOPH RPT ON LACANA CLAIMS - EBY TWP – 1980, Lacana Mining Corp
- Diamond Drilling Report 17 Eby Township – 1980
- ROW MAG EBY – 1980, Noranda Exploration Co Ltd
- ROW DIAMOND DRILLING EBY – 1980
- ROW MAG EBY – 1980, Noranda Exploration Co Ltd
- ROW EM EBY – 1980, Noranda Exploration Co Ltd
- ROW ROCK TRENCHING EBY – 1980
- ROW DIAMOND DRILLING EBY – 1980
1970s
- ROW DIAMOND DRILLING EBY – 1979
- ROW-DIAMOND DRILLING EBY – 1978
- RPT ON GEOL AND GEOCH SUR OF EBY 3-71 GRP - EBY TWP – 1974, Noranda Exploration Co Ltd
- ROW-GEOCHEMICAL EBY – 1974, Noranda Exploration Co Ltd
- ROW-GEOLOGICAL EBY – 1974, Noranda Exploration Co Ltd
- ROW-TRENCHING EBY – 1974
- ROW-MECHANICAL & MANUAL WORK EBY – 1973
- ROW-TRENCHING EBY – 1973
- RPT ON GEOPH WORK PERFORMED ON EBY 1-71; RPT ON GEOPH WORK PERFORMED ON EBY 2-71; RPT ON GEOPH WORK PERFORMED ON EBY 3-71 – 1972, Noranda Exploration Co Ltd
- ROW-EM SUR EBY – 1972, Noranda Exploration Co Ltd
- ROW-MAG SUR EBY – 1972, Noranda Exploration Co Ltd
- ROW-EM SUR EBY – 1972, Noranda Exploration Co Ltd
- ROW-MAG SUR EBY – 1972, Noranda Exploration Co Ltd
- ROW-EM SUR EBY – 1972, Noranda Exploration Co Ltd
- ROW-MAG SUR EBY – 1972, Noranda Exploration Co Ltd
- ROW-TRENCHING EBY – 1972
- ROW-STRIPPING & TRENCHING EBY – 1971
- ROW-MANUAL LABOUR EBY – 1971
- ROW-STRIPPING & TRENCHING EBY – 1970
- ROW-STRIPPING & TRENCHING EBY – 1970
- ROW-STRIPPING & TRENCHING EBY – 1970
- ROW-TRENCHING STRIPPING & TRENCHING EBY – 1970
1960s
- ROW-DIAMOND DRILLING EBY – 1969
- ROW-DIAMOND DRILLING EBY – 1969
- Diamond Drilling Report 15 Eby Township – 1969
- Diamond Drilling Report 14 Eby – 1968
- Diamond Drilling Report 16 Eby Lake – 1966
- RPT OF MAG SUR ON HI-WAY CL – 1966, Taylor Gold Mines Ltd
- Diamond Drilling Report 13 Eby Township – 1965
- Report Magnetic Survey – 1964
- RPT OF EM & GEOL SUR – 1964
1950s
- Diamond Drilling Report 11 Eby – 1955, Dominion Gulf Co
- Diamond Drilling Report 12 Eby – 1955, Dominion Gulf Co
- GEOL SUR RPT; MAG SUR RPT; INTERP OF DTL MAG SUR GRP I; PTG STUDIES CL GRP I – 1952-1953, Dominion Gulf Co
- Diamond Drilling Report 10 Eby Township – 1950, Preston East Dome Mines
1940s
- GEOL RPT - EBY TWP PROP – 1949, Preston East Dome Mines
Drill holes
| Hole | Company | Year | Length | Best gold |
|---|---|---|---|---|
| EO-22-001 | Canada Silver Cobalt Works Inc | 2022 | 108 m | – |
| EO-22-001B | Canada Silver Cobalt Works Inc | 2022 | 531 m | – |
| EO-22-002 | Canada Silver Cobalt Works Inc | 2022 | 450 m | – |
| EO-22-003 | Canada Silver Cobalt Works Inc | 2022 | 636 m | – |
| EO-22-004 | Canada Silver Cobalt Works Inc | 2022 | 969 m | 0.34 g/t |
| KEN21-01X | North Peak Resources | 2021 | 602 m | – |
| EDH-13 | James Kenneth Tinney | 2012 | 147 m | – |
| KK1121 | Michael John Leahy | 2012 | 790 m | – |
| KK1120 | Michael Leahy | 2011 | 336 m | – |
| Eby05-01 | GLR Resources Inc. | 2005 | 335 m | 0.081 g/t |
| Eby05-01A | GLR Resources Inc. | 2005 | 502 m | 0.048 g/t |
| EBY-04-01 | Glr Resc In | 2004 | 272 m | 0.043 g/t |
| GLR-04-01 | GLR Resources Inc | 2004 | 260 m | 0.096 g/t |
| GLR-04-02 | GLR Resources Inc | 2004 | 293 m | 0.237 g/t |
| GLR-04-03 | GLR Resources Inc | 2004 | 212 m | 0.045 g/t |
| GLR-04-04 | GLR Resources Inc | 2004 | 217 m | 1.063 g/t |
| EB95-01 | Greater Lenora Resources Corp | 1995 | 4 m | 0.008 g/t |
| EB95-02 | Greater Lenora Resources Corp | 1995 | 4 m | 0.027 g/t |
| EB95-03 | Greater Lenora Resources Corp | 1995 | 6 m | 0.258 g/t |
| EB95-04 | Greater Lenora Resources Corp | 1995 | 9 m | 0.965 g/t |
| EB95-05 | Greater Lenora Resources Corp | 1995 | 9 m | 2.609 g/t |
| EB95-06 | Greater Lenora Resources Corp | 1995 | 12 m | 0.977 g/t |
| EB95-08 | Greater Lenora Resources Corp | 1995 | 6 m | 0.284 g/t |
| KEN-94-01 | Westminer Can Ltd | 1994 | 325 m | – |
| KEN-94-01 | Westminer Canada Ltd | 1994 | 325 m | – |
| KEN-94-02 | Westminer Canada Ltd | 1994 | 218 m | 0.079 g/t |
| KEN-94-03 | Westminer Canada Ltd | 1994 | 287 m | 0.017 g/t |
| ME94-1 | Greater Lenora Resc Corp | 1994 | 301 m | – |
| E-90-1 | Fernand Rivard | 1990 | 154 m | – |
| E-90-2 | F Rivard | 1990 | 156 m | – |
| ME88-20 | Greater Lenora Resc Corp | 1988 | 268 m | – |
| ME88-25 | Greater Lenora Resc Corp | 1988 | 165 m | – |
| ME88-26 | Greater Lenora Resc Corp | 1988 | 288 m | – |
| ME88-29 | Greater Lenora Resc Corp | 1988 | 200 m | – |
| ME-87-01 | Mary Ellen Resources Ltd | 1987 | 10 m | 0.565 g/t |
| ME-87-02 | Mary Ellen Resources Ltd | 1987 | 12 m | 0.328 g/t |
| ME-87-03 | Mary Ellen Resources Ltd | 1987 | 16 m | 1.035 g/t |
| ME-87-04 | Mary Ellen Resources Ltd | 1987 | 12 m | 25 g/t |
| ME-87-05 | Mary Ellen Resources Ltd | 1987 | 16 m | 1.068 g/t |
| ME-87-06 | Mary Ellen Resources Ltd | 1987 | 17 m | 2.157 g/t |
| ME-87-07 | Mary Ellen Resources Ltd | 1987 | 18 m | 2.332 g/t |
| ME-87-08 | Mary Ellen Resources Ltd | 1987 | 19 m | 1.427 g/t |
| ME-87-09 | Mary Ellen Resources Ltd | 1987 | 19 m | 2.747 g/t |
| ME-87-10 | Mary Ellen Resources Ltd | 1987 | 6 m | 0.448 g/t |
| ME-87-11 | Mary Ellen Resources Ltd | 1987 | 17 m | 9.096 g/t |
| ME-87-12 | Mary Ellen Resources Ltd | 1987 | 7 m | 0.224 g/t |
| ME-87-13 | Mary Ellen Resources Ltd | 1987 | 4 m | 0.12 g/t |
| ME-87-14 | Mary Ellen Resources Ltd | 1987 | 10 m | 4.168 g/t |
| ME-87-15 | Mary Ellen Resources Ltd | 1987 | 10 m | 0.694 g/t |
| ME-87-16 | Mary Ellen Resources Ltd | 1987 | 10 m | – |
| ME-87-17 | Mary Ellen Resources Ltd | 1987 | 8 m | 1.159 g/t |
| ME-87-18 | Mary Ellen Resources Ltd | 1987 | 9 m | 0.323 g/t |
| ME-87-19 | Mary Ellen Resources Ltd | 1987 | 28 m | 0.209 g/t |
| ME-87-20 | Mary Ellen Resources Ltd | 1987 | 12 m | 2.718 g/t |
| ME-87-21 | Mary Ellen Resources Ltd | 1987 | 14 m | 2.751 g/t |
| ME-87-22 | Mary Ellen Resources Ltd | 1987 | 14 m | 0.839 g/t |
| ME-87-23 | Mary Ellen Resources Ltd | 1987 | 12 m | 0.79 g/t |
| ME-87-24 | Mary Ellen Resources Ltd | 1987 | 8 m | 0.27 g/t |
| ME-87-25 | Mary Ellen Resources Ltd | 1987 | 8 m | 6.491 g/t |
| ME-87-26 | Mary Ellen Resources Ltd | 1987 | 10 m | 0.208 g/t |
| ME-87-27 | Mary Ellen Resources Ltd | 1987 | 14 m | 0.37 g/t |
| ME-87-28 | Mary Ellen Resources Ltd | 1987 | 7 m | 0.219 g/t |
| ME-87-29 | Mary Ellen Resources Ltd | 1987 | 14 m | 0.927 g/t |
| ME-87-30 | Mary Ellen Resources Ltd | 1987 | 8 m | 6.507 g/t |
| ME-87-31 | Mary Ellen Resources Ltd | 1987 | 8 m | 0.506 g/t |
| ME-87-32 | Mary Ellen Resources Ltd | 1987 | 10 m | 0.819 g/t |
| ME-87-33 | Mary Ellen Resources Ltd | 1987 | 11 m | 1.002 g/t |
| ME-87-34 | Mary Ellen Resources Ltd | 1987 | 10 m | 0.77 g/t |
| ME-87-35 | Mary Ellen Resources Ltd | 1987 | 14 m | 0.281 g/t |
| ME-87-36 | Mary Ellen Resources Ltd | 1987 | 20 m | 1.36 g/t |
| ME-87-37 | Mary Ellen Resources Ltd | 1987 | 4 m | 0.258 g/t |
| ME-87-38 | Mary Ellen Resources Ltd | 1987 | 15 m | 2.086 g/t |
| ME-87-39 | Mary Ellen Resources Ltd | 1987 | 8 m | 0.257 g/t |
| ME-87-40 | Mary Ellen Resources Ltd | 1987 | 12 m | 0.868 g/t |
| ME-87-41 | Mary Ellen Resources Ltd | 1987 | 14 m | 0.623 g/t |
| ME-87-42 | Mary Ellen Resources Ltd | 1987 | 4 m | – |
| ME-87-43 | Mary Ellen Resources Ltd | 1987 | 8 m | 0.326 g/t |
| ME-87-44 | Mary Ellen Resources Ltd | 1987 | 8 m | 1.908 g/t |
| ME-87-45 | Mary Ellen Resources Ltd | 1987 | 14 m | 0.605 g/t |
| ME-87-46 | Mary Ellen Resources Ltd | 1987 | 10 m | 1.349 g/t |
| ME-87-47 | Mary Ellen Resources Ltd | 1987 | 4 m | 0.895 g/t |
| ME-87-48 | Mary Ellen Resources Ltd | 1987 | 24 m | 7.75 g/t |
| ME-87-49 | Mary Ellen Resources Ltd | 1987 | 17 m | 2.214 g/t |
| ME-87-50 | Mary Ellen Resources Ltd | 1987 | 4 m | – |
| ME-87-51 | Mary Ellen Resources Ltd | 1987 | 24 m | 2.09 g/t |
| ME-87-52 | Mary Ellen Resources Ltd | 1987 | 4 m | 0.287 g/t |
| ME-87-53 | Mary Ellen Resources Ltd | 1987 | 7 m | – |
| ME-87-54 | Mary Ellen Resources Ltd | 1987 | 15 m | 0.252 g/t |
| ME-87-55 | Mary Ellen Resources Ltd | 1987 | 8 m | 0.125 g/t |
| ME-87-56 | Mary Ellen Resources Ltd | 1987 | 12 m | 0.267 g/t |
| ME-87-57 | Mary Ellen Resources Ltd | 1987 | 20 m | 5.938 g/t |
| ME-87-58 | Mary Ellen Resources Ltd | 1987 | 16 m | 0.438 g/t |
| ME-87-59 | Mary Ellen Resources Ltd | 1987 | 32 m | 0.058 g/t |
| ME-87-60 | Mary Ellen Resources Ltd | 1987 | 20 m | – |
| ME-87-61 | Mary Ellen Resources Ltd | 1987 | 13 m | 0.134 g/t |
| ME-87-62 | Mary Ellen Resources Ltd | 1987 | 26 m | – |
| OTTO 80-1-X | Noranda Exploration Co Ltd | 1987 | 45 m | – |
| 185 | Fernand Rivard | 1986 | 122 m | – |
| 186 | Fernand Rivard | 1986 | 154 m | – |
| ME-85-1 | Mary Ellen Resources Ltd | 1985 | 169 m | – |
| ME-85-2 | Mary Ellen Resources Ltd | 1985 | 184 m | – |
| ME-85-3 | Mary Ellen Resources Ltd | 1985 | 154 m | – |
| ME-85-4 | Mary Ellen Resources Ltd | 1985 | 139 m | – |
| ME-85-5 | Mary Ellen Resources Ltd | 1985 | 136 m | – |
| ME-85-6 | Mary Ellen Resources Ltd | 1985 | 145 m | – |
| ME-85-7 | Mary Ellen Resources Ltd | 1985 | 126 m | – |
| ME-85-8 | Mary Ellen Resources Ltd | 1985 | 76 m | – |
| ME85-1 | Greater Lenora Resc Corp | 1985 | 169 m | – |
| ME85-2 | Greater Lenora Resc Corp | 1985 | 184 m | – |
| ME85-3 | Greater Lenora Resc Corp | 1985 | 154 m | – |
| ME85-4 | Greater Lenora Resc Corp | 1985 | 139 m | – |
| ME85-5 | Greater Lenora Resc Corp | 1985 | 136 m | – |
| ME85-6 | Greater Lenora Resc Corp | 1985 | 145 m | – |
| ME85-7 | Greater Lenora Resc Corp | 1985 | 126 m | – |
| 4 | Patrick Harrington | 1980 | 69 m | – |
| 5 | Patrick Harrington | 1980 | 100 m | – |
| 3 | Patrick Harrington | 1979 | 30 m | – |
| 1 | Patrick Harrington | 1978 | 35 m | – |
| 2 | Patrick Harrington | 1978 | 32 m | – |
| Fishkin 3 | M Fishkin | 1969 | 42 m | – |
| F-2 | Morris Fishkin | 1968 | 287 m | – |
| Keevil E66-1 | Keevil Consultants | 1966 | 125 m | – |
| Keevil E66-2 | Keevil Consultants | 1966 | 185 m | – |
| Keevil E66-3 | Keevil Consultants | 1966 | 150 m | – |
| 1 | Unknown | 1965 | 37 m | – |
| S-3 | Siscoe Gold Mines | 1944 | – | – |
| S-4 | Siscoe Gold Mines | 1944 | – | – |
| 1B | Beaucoeur Mines | 1940 | – | – |
| 3 | Beaucoeur Mines | 1940 | – | – |
| 4 | Beaucoeur Mines | 1940 | – | – |
| P-10 | Pioneer Gold Mines | 1939 | – | – |
| P-11 | Pioneer Gold Mines | 1939 | – | – |
| P-12 | Pioneer Gold Mines | 1939 | – | – |
| P-13 | Pioneer Gold Mines | 1939 | – | – |
| P-14 | Pioneer Gold Mines | 1939 | – | – |
| P-9 | Pioneer Gold Mines | 1939 | – | – |
